Regulation No. 681 on external quality assurance and authority under the Energy Act. Pays/Territoire Norvège Type du document Règlement Date 2013 Source FAO, FAOLEX Sujet Énergie Mot clé Politique/planification Conservation de l'énergie/production de l'énergie Collecte de données/déclarations Évaluation/gestion des risques Procédures judiciaires/procédures administratives Aire géographique Europe, Europe et Asie Centrale, Atlantique Nord, Mer du Nord, Atlantique du Nord-Est, Europe du Nord Entry into force notes 1 July 2013. Résumé This Regulation sets rules on the planning of new power line construction, requiring the preparation of a conceptual study with details requirements and alternative concepts. The planning shall ensure to provide an external quality assurance authorized by the Ministry. The Regulation applies to the Concept of Principle solution meeting the needs of the energy system; to large power line constructions ( one or more plants that require construction license in adherence to article 3-1 of the Energy Act to a voltage level of min. 300 kV and to a min. length of 20 km); to the upgrading, rebuilding or extension of installations for electric energy supply. Operation of existing facilities shall not preclude rebuilding or upgrading for limited transitional period. Texte intégral Norvégien Site web www.lovdata.no Références - Législation Implemente Act No. 50 of 1990 relating to the generation, conversion, transmission, trading, distribution and use of energy etc. (Energy Act). Législation | Norvège | 1990 (2010) Mot clé: Conservation de l'énergie/production de l'énergie, Politique/planification, Autorisation/permis, Système d'alerte précoce, Lutte contre la pollution, Risques, EIA, Patrimoine culturel Source: FAO, FAOLEX