Regulation No. 681 on external quality assurance and authority under the Energy Act. País/Territorio Noruega Tipo de documento Reglamento Fecha 2013 Fuente FAO, FAOLEX Materia Energía Palabra clave Política/planificación Conservación de energía/producción de energía Recopilación de datos/informes Evaluación/manejo de riesgos Procedimientos judiciales/procedimientos administrativos Área geográphica Europa, Europa y Central Asia, Atlántico Norte, Mar del Norte, Atlántico Nordeste, Europa Septentrional Entry into force notes 1 July 2013. Resumen This Regulation sets rules on the planning of new power line construction, requiring the preparation of a conceptual study with details requirements and alternative concepts. The planning shall ensure to provide an external quality assurance authorized by the Ministry. The Regulation applies to the Concept of Principle solution meeting the needs of the energy system; to large power line constructions ( one or more plants that require construction license in adherence to article 3-1 of the Energy Act to a voltage level of min. 300 kV and to a min. length of 20 km); to the upgrading, rebuilding or extension of installations for electric energy supply. Operation of existing facilities shall not preclude rebuilding or upgrading for limited transitional period. Texto completo Noruego Página web www.lovdata.no Referencias - Legislación Implementa Act No. 50 of 1990 relating to the generation, conversion, transmission, trading, distribution and use of energy etc. (Energy Act). Legislación | Noruega | 1990 (2010) Palabra clave: Conservación de energía/producción de energía, Política/planificación, Autorización/permiso, Sistema de alerta temprana, Control de la contaminación, Peligros, EIA, Patrimonio cultural Fuente: FAO, FAOLEX