Order No. 1032 on net metering/calculation for own electricity production. Pays/Territoire Danemark Type du document Règlement Date 2013 Source FAO, FAOLEX Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Énergie renouvelable Éco-produits/processus écologique Aire géographique Europe, Europe et Asie Centrale, Pays de l'Union Européenne, Mer du Nord, Atlantique du Nord-Est, Europe du Nord Entry into force notes 1 September 2013. Article 16 (section 1, No. 3) shall enter into force as of 20 November 2012. Résumé The purpose of the Order is to establish net calculation exemption from own production of partial or whole private consumption of electricity. Private producers of electricity from generating plants, which have a nominal electrical output may request to Energinet.dk to have a net metering, which is calculated on an hourly basis and by which the producer is exempted from paying for environmentally friendly electricity. In particular, 50 kW for solar installations (1), 25 kW for wind turbines (2) and 11 kW for heat and power plants not included in 1 and 2. Texte intégral Danois Site web www.retsinformation.dk Références - Législation Implemente Electricity Supply Act (No. 984 of 2021). Législation | Danemark | 1999 (2021) Mot clé: Législation de base, Conservation de l'énergie/production de l'énergie, Commerce intérieur, Énergie renouvelable, Inspection, Procédures judiciaires/procédures administratives Source: FAO, FAOLEX