Order No. 1032 on net metering/calculation for own electricity production. País/Territorio Dinamarca Tipo de documento Reglamento Fecha 2013 Fuente FAO, FAOLEX Materia Energía Palabra clave Conservación de energía/producción de energía Energía renovable Eco-productos/ecoprocesos Área geográphica Europa, Europa y Central Asia, Países de la Unión Europea, Mar del Norte, Atlántico Nordeste, Europa Septentrional Entry into force notes 1 September 2013. Article 16 (section 1, No. 3) shall enter into force as of 20 November 2012. Resumen The purpose of the Order is to establish net calculation exemption from own production of partial or whole private consumption of electricity. Private producers of electricity from generating plants, which have a nominal electrical output may request to Energinet.dk to have a net metering, which is calculated on an hourly basis and by which the producer is exempted from paying for environmentally friendly electricity. In particular, 50 kW for solar installations (1), 25 kW for wind turbines (2) and 11 kW for heat and power plants not included in 1 and 2. Texto completo Danés Página web www.retsinformation.dk Referencias - Legislación Implementa Electricity Supply Act (No. 984 of 2021). Legislación | Dinamarca | 1999 (2021) Palabra clave: Legislación básica, Conservación de energía/producción de energía, Comercio interior, Energía renovable, Inspección, Procedimientos judiciales/procedimientos administrativos Fuente: FAO, FAOLEX