Ordinance relating to the Federal Power Supply Act. Pays/Territoire Suisse Sous-division territoriale Uri Type du document Règlement Date 2008 Source FAO, FAOLEX Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Production d'énergie hydroélectrique Institution Mise en application Infractions/sanctions Aire géographique Alpes, Europe, Europe et Asie Centrale, Atlantique du Nord-Est, Europe du Ouest Entry into force notes The present Ordinance enters into force on 1 January 2009. Résumé The present Ordinance implements the Federal Power Supply Act of 23 March 2007. In particular, the Ordinance lays down provisions relating to a correct and efficient enforcement of the afore-mentioned Act in the Canton Uri. The text - consisting of 11 articles – deals with the following aspects: subject matter, allocation of grid areas, connection duty outside the network area, connection outside the building zone, existing connections, adjustment of network tariffs. Texte intégral Allemand Site web www.ur.ch Références - Législation Implemente Loi sur l’approvisionnement en électricité (LApEl). Législation | Suisse | 2007 (2017) Mot clé: Conservation de l'énergie/production de l'énergie, Production d'énergie hydroélectrique, Institution, Droits/redevances relatives à l'environnement Source: FAO, FAOLEX