Water Drillings Control Regulation (Wells measurements operations )- 1963 País/Territorio Israel Tipo de documento Reglamento Fecha 1963 (1963) Fuente FAO, FAOLEX Fuente original Dinim Vol.27 Pp.16663 Materia Agua Palabra clave Inspección Perforación de pozos/pozos Aguas subterráneas Monitoreo Área geográphica Asia, Europa y Central Asia, Mediterráneo, Medio Oriente, Asia Occidental Resumen This Regulation, of 7 Sections, gives definitions and makes provisions for measurement procedures for wells. Section (1) gives definitions; A Producer is defined as he who produces water from a well or he who is in charge of a water extracting facility. Sections (2) to (5) provide for measuring procedures that will be operated by the Water Governor or by his delegate that shall notify the producer 48 hours before measurement operations. The water must be quiet and pumping must be stopped from 00:01 to 16:00 of measuring date. Section (6) provides for not more than one monthly measurement per well. Section (7) gives general information. Texto completo Hebreo Referencias - Legislación Implementa Water Drilling Control Law, 5715-1955. Legislación | Israel | 1955 Palabra clave: Legislación básica, Aguas subterráneas, Perforación de pozos/pozos, Institución, Autorización/permiso, Inspección, Infracciones/sanciones Fuente: FAO, FAOLEX