Water Board (Works) Regulations (Cap. 198). Pays/Territoire Zambie Type du document Règlement Date 1993 (2006) Source FAO, FAOLEX Source d'origine Laws of Zambia, 2006 Revised Edition, Vol. 12, Chapter 198. Sujet Eau Mot clé Ouvrages Autorisation/permis Infractions/sanctions Aire géographique Afrique, Afrique Orientale, Nations en développement sans littoral, Pays les moins avances Résumé These Regulations provide for: design of works, approval of design by the Provincial Water Engineer or Senior Water Engineer in the locality or the Water Officer appointed by the Water Board, supervision of works by a qualified and competent engineer, design deviation and unauthorized construction, and inspection of works inspected by officers appointed by the Water Board. The design of any works shall be made by a qualified and competent engineer and shall include a detailed report with all the necessary drawings. Any deviation during construction from the approved plan and any works constructed without the authority of the Water Board are declared to be an offence and such works shall be demolished. The Water Board may order any person or institution to execute such acts or repairs with respect to the works as may be necessary and, in the case of default, the Water Board shall carry out the act or repair and recover the cost from the defaulter. (6 regulations) Texte intégral Anglais Références - Législation Implemente Water Act (Cap. 198). Législation | Zambie | 1949 (2006) Mot clé: Législation de base, Institution, Inspection, Droits d'utilisation de l'eau, Servitude, Eau à usage industriel Source: FAO, FAOLEX