Order No. 260 on exemption of requirement for corporate unbundling for certain municipal solar power plants. Pays/Territoire Danemark Type du document Règlement Date 2014 Source FAO, FAOLEX Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Commerce intérieur Mise en application Éco-produits/processus écologique Énergie renouvelable Aire géographique Europe, Europe et Asie Centrale, Pays de l'Union Européenne, Mer du Nord, Atlantique du Nord-Est, Europe du Nord Entry into force notes 24 March 2014. Résumé The Order establishes regulations for the establishment of municipal solar power plants, and the exemption therewith from the requirements specified in article 4, section 1 of the Electricity Supply Act - which requires local electricity to be supplied by a limited liability company. A municipality can produce electricity from solar PV without fulfilling the requirement of corporate unbundling of the facility if the system is connected to the grid by 28 June 2013. Energinet.dk will provide for energy supply within a pool of 20 MW installed capacity and within the commitments provided for an exemption from the requirement of corporate unbundling of municipally owned solar PV. Texte intégral Danois Site web www.retsinformation.dk Références - Législation Implemente Electricity Supply Act (No. 984 of 2021). Législation | Danemark | 1999 (2021) Mot clé: Législation de base, Conservation de l'énergie/production de l'énergie, Commerce intérieur, Énergie renouvelable, Inspection, Procédures judiciaires/procédures administratives Source: FAO, FAOLEX Amendé par Order No. 847 amending Order on exemption of requirement for corporate unbundling for certain municipal solar power plants. Législation | Danemark | 2014 Mot clé: Énergie renouvelable, Contrat/accord, Commerce intérieur Source: FAO, FAOLEX