Electricity Grid Charges Ordinance. Pays/Territoire Allemagne Type du document Règlement Date 2005 Source FAO, FAOLEX Source d'origine Bundesgesetzblatt, Part I, No. 46, 28 July 2005, pp. 2225-2242. Titre completOrdinance on charges for access to electricity supply networks. Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Royalties/redevances Production d'énergie hydroélectrique Aire géographique Alpes, Europe, Europe et Asie Centrale, Pays de l'Union Européenne, Mer du Nord, Atlantique du Nord-Est, Europe du Ouest Résumé The present Ordinance implements the Energy Industry Act of 7 July 2005 (BGBl. I p. 1970). In particular, the Ordinance lays down provisions relating to the establishment of the method to determine charges to access electricity supply networks. The text consist of 33 articles divided into 5 Parts as follows: General provisions (1); Method to determine charges for electricity net access (2); Comparative method (3); Duties of net operators (4); Other provisions (5). Texte intégral Allemand Site web www.bgbl.de Références - Législation Implemente Energy Industry Act. Législation | Allemagne | 2005 (2024) Mot clé: Législation de base, Conservation de l'énergie/production de l'énergie, Planification environnementale, Collecte de données/déclarations, Énergie renouvelable, Éco-produits/processus écologique, Émissions, Commerce/industrie/sociétés, Certification, EIA, Politique/planification, Production d'énergie hydroélectrique Source: FAO, FAOLEX