Electricity (Development of Small Power Projects) Rules, 2017 (G.N. No. 440 of 2017). Pays/Territoire République-Unie de Tanzanie Type du document Règlement Date 2017 Source FAO, FAOLEX Source d'origine Gazette of the United Republic of Tanzania of 27 October 2017. Sujet Agriculture et développement rural, Énergie, Environnement gén., Eau Mot clé Développement agricole Conservation de l'énergie/production de l'énergie Éco-produits/processus écologique Bioénergie EIA Approvisionnement en eau Aire géographique Afrique, Afrique Orientale, Pays les moins avances Résumé These Regulations concern principally the Development of Small Power Projects (SPPs) using hydro and biomass technologies. For these projects, all Carbon Credits shall be provided, as per procedure prescribed by the Clean Development Mechanism Guidelines issued by the United Nations Framework Convention on Climate Change (UNFCCC). An SPP developer shall obtain all necessary approvals on environmental and social clearance pursuant to relevant laws. A person shall not commence commercial operation of an SPP or small power distributor unless the project has been licensed or registered by the Energy and Water Utilities Regulatory Authority. Texte intégral Anglais Site web www.parliament.go.tz Références - Législation Implemente Electricity Act, 2008 (No. 10 of 2008). Législation | République-Unie de Tanzanie | 2008 Mot clé: Conservation de l'énergie/production de l'énergie, Institution, Expropriation Source: FAO, FAOLEX