Order No. 260 on exemption of requirement for corporate unbundling for certain municipal solar power plants. País/Territorio Dinamarca Tipo de documento Reglamento Fecha 2014 Fuente FAO, FAOLEX Materia Energía Palabra clave Conservación de energía/producción de energía Comercio interior Cumplimiento/aplicación Eco-productos/ecoprocesos Energía renovable Área geográphica Europa, Europa y Central Asia, Países de la Unión Europea, Mar del Norte, Atlántico Nordeste, Europa Septentrional Entry into force notes 24 March 2014. Resumen The Order establishes regulations for the establishment of municipal solar power plants, and the exemption therewith from the requirements specified in article 4, section 1 of the Electricity Supply Act - which requires local electricity to be supplied by a limited liability company. A municipality can produce electricity from solar PV without fulfilling the requirement of corporate unbundling of the facility if the system is connected to the grid by 28 June 2013. Energinet.dk will provide for energy supply within a pool of 20 MW installed capacity and within the commitments provided for an exemption from the requirement of corporate unbundling of municipally owned solar PV. Texto completo Danés Página web www.retsinformation.dk Referencias - Legislación Implementa Electricity Supply Act (No. 984 of 2021). Legislación | Dinamarca | 1999 (2021) Palabra clave: Legislación básica, Conservación de energía/producción de energía, Comercio interior, Energía renovable, Inspección, Procedimientos judiciales/procedimientos administrativos Fuente: FAO, FAOLEX Enmendado porr Order No. 847 amending Order on exemption of requirement for corporate unbundling for certain municipal solar power plants. Legislación | Dinamarca | 2014 Palabra clave: Energía renovable, Contrato/acuerdo, Comercio interior Fuente: FAO, FAOLEX