Order No. 1401 on adjustment of compensation to certain wind turbines. País/Territorio Dinamarca Tipo de documento Reglamento Fecha 2015 Fuente FAO, FAOLEX Materia Energía Palabra clave Energía renovable Conservación de energía/producción de energía Equidad Área geográphica Europa, Europa y Central Asia, Países de la Unión Europea, Mar del Norte, Atlántico Nordeste, Europa Septentrional Entry into force notes 1 January 2016. Resumen This Order applies to the balance allowance granted to wind turbines mounted and connected to the grid on 1 January 2014 or later, exception made for these covered by art. 41 of the Act on the promotion of renewable energy, and offshore wind turbines covered by art. 35b, 37. To wind turbines mounted and activated between 21 February 2008 and 31 December 2013, with the exception of these covered by art. 41, 35 and 37 of same Act. And to wind turbines activated latest on 20 February 2008, with the exception of wind turbines subject to surcharges according to art. 39-41 of the same Act, and utility-financed wind turbines connected to the grid by 31 December 1999 in accordance with art. 38 of the Act. Texto completo Danés Página web www.retsinformation.dk Referencias - Legislación Implementa Act on Promotion of Renewable Energy (No. 122 of 2015). Legislación | Dinamarca | 2013 (2015) Palabra clave: Eco-productos/ecoprocesos, Conservación de energía/producción de energía, Normas sobre calidad ambiental, Producción de energía hidroeléctrica, Comercio interior, Energía renovable, Subvención/incentivo, Cambio climático, Legislación básica, Normas, Protección del medio ambiente, Protección del hábitat, Uso sostenible Fuente: FAO, FAOLEX