North Wales Wind Farms Connection Order 2016 (S.I. No. 818 of 2016). País/Territorio Reino Unido Tipo de documento Reglamento Fecha 2016 Fuente FAO, FAOLEX Materia Energía, Medio ambiente gen., Tierra y suelos, Agua Palabra clave Energía renovable Autorización/permiso EIA Eco-productos/ecoprocesos Manejo de tierras Contaminación de las aguas dulces Efluente de aguas residuales/vertido Desarrollo sostenible Control de la contaminación Área geográphica Islas del Océano Atlántico, Europa, Europa y Central Asia, Atlántico Norte, Mar del Norte, Atlántico Nordeste, Europa Septentrional Resumen This Order, made under the Planning Act 2008, provides for “development consent” for a large specific wind farm project. This project shall conform various environmental standards and plans. The undertaker of the project shall also have regard to various requirements regarding discharge of water and protection of water resources. The Order does not authorise any water discharge activities or groundwater activities for which a licence is required pursuant to regulation 12(1)(b) of the Environmental Permitting (England and Wales) Regulations 2010. The Order also concerns (environmental requirements for) the decommissioning of the project. Texto completo Inglés Página web www.opsi.gov.uk Referencias - Legislación Implementa Planning Act 2008 (Cap. 29). Legislación | Reino Unido | 2008 Palabra clave: Manejo de tierras, Planificación ambiental, Institución, EIA, Expropiación, Legislación básica, Política/planificación, Gestión de desechos, Instalaciones, Efluente de aguas residuales/vertido, Control de la contaminación, Contaminación de las aguas dulces Fuente: FAO, FAOLEX