Environmental Protection and Pollution Control (Environmental Impact Assessment) Regulations (Cap. 204). País/Territorio Zambia Tipo de documento Reglamento Fecha 1997 (2006) Fuente FAO, FAOLEX Fuente original Laws of the Republic of Zambia, Revised Edition 2006, Chapter 204. Materia Medio ambiente gen. Palabra clave EIA Autorización/permiso Planificación ambiental Auditoría ambiental Política/planificación Área geográphica Africa, Africa Oriental, Naciones en desarrollo sin litoral, Países menos desarrollados Resumen These Regulations provide for procedures and requirements for compulsory project briefs and environment impact assessment and environment impact assessment statements. Part II is dedicated to project briefs. A project brief is a report on "preliminary preconditions" of possible impact of a project included in the list of the First Schedule on the environment and as such the first step of EIA. The Environment Council may require also projects briefs for projected not listed in the First Schedule. The brief shall be drawn up in accordance with requirements of regulation 4 and be submitted to the Council which shall review the brief and, when approving of it, send a decision letter to the authorizing agency (defined in regulation 2) (regs. 4-6). Where the Council decides that a project is likely to have a significant impact on the environment, it shall require an EIA to be prepared in accordance with these Regulations. The Second Schedule sets out those projects for which an EIA may be required. The developer of a project shall consult with local communities prior to submission of an EIA statement (reg. 10). Contents of the statement are outlined in regulation 11. The statement includes an impact management plan containing a description of measures proposed for preventing, minimising, or compensating for any adverse impact, and enhancing beneficial effects, and measures to monitor pollution. Part IV contains rules for the review of EIA Statements by the Council. The Council shall organize public hearings and hold consultations in accordance with regulations 16 to 19). Part VII provides for post-assessment environmental audits by persons qualified by the Council. (38 regulations divided into 10 Parts and completed by 5 Schedules) Texto completo Inglés Página web www.zema.org.zm Referencias - Legislación Implementa Environment Protection and Pollution Control Act, 1990 (Cap. 204). Legislación | Zambia | 1990 (2006) Palabra clave: Control de la contaminación, Calidad del aire/contaminación del aire, Contaminación acústica, Radiación, Legislación básica, Institución, Autorización de pesca, Manejo y conservación pesquera, Autorización/permiso, Eliminación de desechos, Sustancias peligrosas, Plaguicidas, Efluente de aguas residuales/vertido, Gestión de desechos, Contaminación de las aguas dulces, Aguas continentales, Registro Fuente: FAO, FAOLEX Enmendado porr Environmental Protection and Pollution Control (Environmental Impact Assessment) (Amendment) Regulations, 2009 (S.I. No. 87 of 2009). Legislación | Zambia | 2009 Palabra clave: EIA, Procedimientos judiciales/procedimientos administrativos Fuente: FAO, FAOLEX