Ecolex Logo
The gateway to
environmental law
Search results » Legislation

Order No. 260 on exemption of requirement for corporate unbundling for certain municipal solar power plants.

Country/Territory
Denmark
Document type
Regulation
Date
2014
Source
FAO, FAOLEX
Subject
Energy
Keyword
Energy conservation/energy production Internal trade Enforcement/compliance Ecofriendly products/ecofriendly processes Renewable energy
Geographical area
Europe, Europe and Central Asia, European Union Countries, North Sea, North-East Atlantic, Northern Europe
Entry into force notes
24 March 2014.
Abstract

The Order establishes regulations for the establishment of municipal solar power plants, and the exemption therewith from the requirements specified in article 4, section 1 of the Electricity Supply Act - which requires local electricity to be supplied by a limited liability company. A municipality can produce electricity from solar PV without fulfilling the requirement of corporate unbundling of the facility if the system is connected to the grid by 28 June 2013. Energinet.dk will provide for energy supply within a pool of 20 MW installed capacity and within the commitments provided for an exemption from the requirement of corporate unbundling of municipally owned solar PV.

Full text
Danish
Website
www.retsinformation.dk

References - Legislation

Implements

Electricity Supply Act (No. 984 of 2021).

Legislation | Denmark | 1999 (2021)

Keyword: Basic legislation, Energy conservation/energy production, Internal trade, Renewable energy, Inspection, Legal proceedings/administrative proceedings

Source: FAO, FAOLEX

Amended by

Order No. 847 amending Order on exemption of requirement for corporate unbundling for certain municipal solar power plants.

Legislation | Denmark | 2014

Keyword: Renewable energy, Contract/agreement, Internal trade

Source: FAO, FAOLEX