Order No. 260 on exemption of requirement for corporate unbundling for certain municipal solar power plants. Country/Territory Denmark Document type Regulation Date 2014 Source FAO, FAOLEX Subject Energy Keyword Energy conservation/energy production Internal trade Enforcement/compliance Ecofriendly products/ecofriendly processes Renewable energy Geographical area Europe, Europe and Central Asia, European Union Countries, North Sea, North-East Atlantic, Northern Europe Entry into force notes 24 March 2014. Abstract The Order establishes regulations for the establishment of municipal solar power plants, and the exemption therewith from the requirements specified in article 4, section 1 of the Electricity Supply Act - which requires local electricity to be supplied by a limited liability company. A municipality can produce electricity from solar PV without fulfilling the requirement of corporate unbundling of the facility if the system is connected to the grid by 28 June 2013. Energinet.dk will provide for energy supply within a pool of 20 MW installed capacity and within the commitments provided for an exemption from the requirement of corporate unbundling of municipally owned solar PV. Full text Danish Website www.retsinformation.dk References - Legislation Implements Electricity Supply Act (No. 984 of 2021). Legislation | Denmark | 1999 (2021) Keyword: Basic legislation, Energy conservation/energy production, Internal trade, Renewable energy, Inspection, Legal proceedings/administrative proceedings Source: FAO, FAOLEX Amended by Order No. 847 amending Order on exemption of requirement for corporate unbundling for certain municipal solar power plants. Legislation | Denmark | 2014 Keyword: Renewable energy, Contract/agreement, Internal trade Source: FAO, FAOLEX