Ecolex Logo
Le portail au
droit de l'environnement
Résultats de la recherche » Législation

Transmission Regulation (Alta. Reg. 86/2007).

Pays/Territoire
Canada
Sous-division territoriale
Alberta
Type du document
Règlement
Date
2007 (2019)
Source
FAO, FAOLEX
Sujet
Énergie
Mot clé
Conservation de l'énergie/production de l'énergie Production d'énergie hydroélectrique Royalties/redevances Mise en application
Aire géographique
Amériques, Arctique, Asie et Pacifique, Pacifique du Est, Amérique du Nord, Atlantique Nord
Entry into force notes
For the purpose of ensuring its revision, this Regulation expires on 31 December 2021.
Résumé

The present Regulation is made under the Electric Utilities Act. In particular, the Regulation provides for an off-tariff approach to steering new generating facilities to high-demand areas. The incentives took the form of “system contribution payments” and “loss charges. ”System contribution payments” are one-time charges to new generators that vary depending upon the plant location in relation to the transmission system. The payments ultimately are refundable. Loss charges are based on a generator’s average impact on transmission losses, and are adjusted annually. The text consists of 54 sections divided into 8 Parts as follows: ISO’s Consultation obligations and additional duties (1); Transmission system planning (2); Transmission system criteria and reliability standards (3); Transmission facility projects (4); Local interconnection costs and transmission contribution costs (5); Transmission system losses, charges and credits (6); Commission responsibilities (7); Time period extension, paramountcy, recovery of must-run costs, transition, repeal and expiry (8).

Texte intégral
Anglais
Site web
www.gov.ab.ca

Références - Législation

Implemente

Electric Utilities Act (RSA 2003, c. E-5.1).

Législation | Canada | 2003 (2020)

Mot clé: Conservation de l'énergie/production de l'énergie, Commerce intérieur, Institution, Inspection