Town and Country Planning (Environmental Impact Assessment) (Wales) (Amendment) Regulations 2016 (W.S.I. No. 971 (W. 240) of 2016). Pays/Territoire Royaume-Uni Sous-division territoriale Wales Type du document Règlement Date 2016 Source FAO, FAOLEX Sujet Environnement gén., Terre et sols Mot clé EIA Planification territoriale Procédures judiciaires/procédures administratives Autorisation/permis Accès-à-l'information Aire géographique Îles de l'Océan Atlantique, Europe, Europe et Asie Centrale, Atlantique Nord, Mer du Nord, Atlantique du Nord-Est, Europe du Nord Résumé These Regulations amend the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations, 2016 by substituting regulation 57(2). As a result, the period prescribed in article 22(2) after which an applicant can appeal if an application which requires an EIA is amended but not determined, becomes four weeks from the date the amendment is received by the authority or twenty weeks from the date the original application which requires an EIA was received, whichever is the longer. Texte intégral Anglais Site web www.opsi.gov.uk Références - Législation Amende Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016 (W.S.I. No. 58 (W. 28) of 2016). Législation | Royaume-Uni | 2016 Mot clé: EIA, Planification territoriale, Procédures judiciaires/procédures administratives, Autorisation/permis, Accès-à-l'information, Élimination de déchets, Déchets dangereux, Transport/dépôt, Gestion des déchets Source: FAO, FAOLEX