Resolution No. 682 of 2020 of Georgian Government on Plan of Separation of Electricity Transmission System Operator of Georgia Pays/Territoire Géorgie Type du document Règlement Date 2020 Source FAO, FAOLEX Source d'origine 300280000.10.003.022403 Sujet Énergie Mot clé Commerce/industrie/sociétés Conservation de l'énergie/production de l'énergie Gouvernance Commerce intérieur Aire géographique Asie, Mer Noire, Europe de l'Est, Europe, Europe et Asie Centrale, Asie Occidentale Résumé This Resolution approves the plan of separation of the operator of the electricity transmission system of Georgia. It consists of four articles: Model of the separation (1); General principles for regulating the activities of the transmission system operator (2); Measures to be taken for the separation (3); and Separation of property of the operator (4). Texte intégral Géorgien Site web matsne.gov.ge Références - Législation Implemente Law of Georgia on Energy and Water Supply (No. 5646-RS of 2019) Législation | Géorgie | 2019 Mot clé: Législation de base, Loi-cadre, Conservation de l'énergie/production de l'énergie, Mise en application, Transport/dépôt, Gaz naturel, Institution, Commerce/industrie/sociétés, Autorisation/permis, Approvisionnement en eau, Gouvernance, Ouvrages Source: FAO, FAOLEX