Regulations on supervision and administration of dam operation and safety of hydropower stations. Pays/Territoire Chine Type du document Règlement Date 2015 Source FAO, FAOLEX Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Production d'énergie hydroélectrique Inspection Système d'alerte précoce Enregistrement Aire géographique Asie, Asie et Pacifique, East Asian Seas, Asie Orientale, Pacifique Nord, Pacifique Nord Occidental Entry into force notes These Regulations enter into force on 1 April 2015. Résumé The purpose of these Regulations is to strengthen supervision and management of hydropower station dam operation safety, protect the people’s life and property safety. The Text consists of 46 Articles divided into 7 Chapters: General provisions (I); Operation management (II); Regular inspection (III); Registration (IV); Supervision and administration (VI); Supplementary provisions (VII). Texte intégral Chinois Site web www.chinalaw.gov.cn Références - Législation Implementé par Measures for supervision and administration on regular dam safety inspection of hydropower stations. Législation | Chine | 2015 Mot clé: Conservation de l'énergie/production de l'énergie, Production d'énergie hydroélectrique, Inspection Source: FAO, FAOLEX Circular of the National Energy Administration on Printing and Issuing the Measures for Emergency Management of the Safe Operation of the Dams of Hydroelectric Power Stations. Législation | Chine | 2022 Mot clé: Conservation de l'énergie/production de l'énergie, Collecte de données/déclarations, Inspection, Risques, Système d'alerte précoce, Production d'énergie hydroélectrique, Ouvrages Source: FAO, FAOLEX