Ecolex Logo
Le portail au
droit de l'environnement
Résultats de la recherche » Législation

Prime Minister’s Decision No. 722 of 2022 issuing the Executive Regulations for the Law regulating Waste Management promulgated by Law No. 202 of 2020.

Pays/Territoire
Égypte
Type du document
Règlement
Date
2022
Source
FAO, FAOLEX
Sujet
Environnement gén., Déchets et substances dangereuses
Mot clé
Gestion des déchets Eaux usées/déversement Déchets dangereux Recyclage/réemploi Élimination de déchets Déchets non-ménagers Autorisation/permis Commerce/industrie/sociétés Renforcement des capacités Éducation Institution Gestion intégrée Monitorage Questions de procédures Protection de l’environnement Partenariats public-privé (PPP) Déchets solides Normes Utilisation durable Transport/dépôt Déchets ménagers Prévention des déchets
Aire géographique
Afrique, Méditerranée, Moyen-Orient, Afrique du Nord et Proche-Orient, Afrique du Nord, Mer Rouge et le Golfe d'Aden
Entry into force notes
These Regulations enter into force the day after their publication in the Official Gazette.
Résumé

These Regulations, comprising 56 articles divided into six Chapters, address a range of topics including general provisions, the national integrated waste management strategy, the duties and responsibilities of involved entities, the prerequisites for conducting integrated waste management operations, and the classification of waste types such as non-hazardous, municipal, construction, agricultural, industrial, and hazardous waste. Additionally, they incorporate provisional measures and provide template forms for license applications, waste registers, and guidelines within the 15 attached Schedules. Chapter three outlines a key policy mandating that waste generators or owners must ensure the secure disposal of waste from their facilities, projects, or operations upon the delivery, initiation, or conclusion of any new, refurbished, or existing projects. This disposal should be completed within a maximum period of twenty days following the project's delivery, start, or the end of the activities that produced the waste, particularly when the waste is located beyond the premises of the specified facilities or projects. Furthermore, these individuals or entities are obligated to comply with the guidelines and stipulations detailed in the appendices accompanying these regulations. The Regulations provide for a grace period of one year for relevant entities to comply with their provisions.

Texte intégral
Arabe
Site web
www.eeaa.gov.eg

Références - Législation

Implemente

Waste Management Law No.202 of 2020.

Législation | Égypte | 2020

Mot clé: Protection de l’environnement, Déchets dangereux, Élimination de déchets, Gestion des déchets, Prévention des déchets, Législation de base, Gestion intégrée, Déchets non-ménagers, Déchets solides, Recyclage/réemploi, Fonds spécial, Transport/dépôt, Éco-produits/processus écologique, Substances dangereuses, Santé publique, Institution, Entité non-gouvernementale, Subvention/incitation, Autorisation/permis, Pollution des eaux douces, Lutte contre la pollution

Source: FAO, FAOLEX