Order No. 1401 on adjustment of compensation to certain wind turbines. Pays/Territoire Danemark Type du document Règlement Date 2015 Source FAO, FAOLEX Sujet Énergie Mot clé Énergie renouvelable Conservation de l'énergie/production de l'énergie Équité Aire géographique Europe, Europe et Asie Centrale, Pays de l'Union Européenne, Mer du Nord, Atlantique du Nord-Est, Europe du Nord Entry into force notes 1 January 2016. Résumé This Order applies to the balance allowance granted to wind turbines mounted and connected to the grid on 1 January 2014 or later, exception made for these covered by art. 41 of the Act on the promotion of renewable energy, and offshore wind turbines covered by art. 35b, 37. To wind turbines mounted and activated between 21 February 2008 and 31 December 2013, with the exception of these covered by art. 41, 35 and 37 of same Act. And to wind turbines activated latest on 20 February 2008, with the exception of wind turbines subject to surcharges according to art. 39-41 of the same Act, and utility-financed wind turbines connected to the grid by 31 December 1999 in accordance with art. 38 of the Act. Texte intégral Danois Site web www.retsinformation.dk Références - Législation Implemente Act on Promotion of Renewable Energy (No. 122 of 2015). Législation | Danemark | 2013 (2015) Mot clé: Éco-produits/processus écologique, Conservation de l'énergie/production de l'énergie, Normes environnementales, Production d'énergie hydroélectrique, Commerce intérieur, Énergie renouvelable, Subvention/incitation, Changement de climat, Législation de base, Normes, Protection de l’environnement, Protection de l'habitat, Utilisation durable Source: FAO, FAOLEX