Order No. 125 on surcharges applied to electricity produced by photovoltaic plants connected to the grid on 20 November 2012 or later. Pays/Territoire Danemark Type du document Règlement Date 2015 Source FAO, FAOLEX Sujet Énergie, Mer Mot clé Conservation de l'énergie/production de l'énergie Commerce intérieur Énergie renouvelable Royalties/redevances Aire géographique Europe, Europe et Asie Centrale, Pays de l'Union Européenne, Mer du Nord, Atlantique du Nord-Est, Europe du Nord Entry into force notes 11 February 2015. Résumé The purpose of this Order is to establish surcharges to apply on the production of electricity by photovoltaic plants connected from 20 November 2012 and thereafter. Surcharges may be augmented in accordance to Energinet.dk, specifically for pool of photovoltaic plants of 20MW/year production between 2013-2016. Agreement for the increase of surcharges is based on the installation address specified in the application, and may not delegated. Texte intégral Danois Site web www.retsinformation.dk Références - Législation Implemente Act on Promotion of Renewable Energy (No. 122 of 2015). Législation | Danemark | 2013 (2015) Mot clé: Éco-produits/processus écologique, Conservation de l'énergie/production de l'énergie, Normes environnementales, Production d'énergie hydroélectrique, Commerce intérieur, Énergie renouvelable, Subvention/incitation, Changement de climat, Législation de base, Normes, Protection de l’environnement, Protection de l'habitat, Utilisation durable Source: FAO, FAOLEX