Ecolex Logo
Le portail au
droit de l'environnement
Résultats de la recherche » Législation

Measures on consent system for water project construction planning (trial).

Pays/Territoire
Chine
Type du document
Règlement
Date
2007 (2017)
Source
FAO, FAOLEX
Sujet
Eau
Mot clé
Ouvrages Autorisation/permis Politique/planification Inondation
Aire géographique
Asie, Asie et Pacifique, East Asian Seas, Asie Orientale, Pacifique Nord, Pacifique Nord Occidental
Résumé

These Measures, consist of 19 Articles, are enacted according to the Water Law of the People's Republic of China, the Flood Control Law of the People's Republic of China, aiming to strengthen the supervision and management of water engineering construction, ensure that water engineering construction conforms to the requirements of river basin comprehensive planning and flood control planning.

Texte intégral
Chinois
Site web
www.cjw.gov.cn