Measures for the administration of acceptance of hydropower engineering projects.

Pays/Territoire
Chine
Type du document
Règlement
Date
2011
Source
FAO, FAOLEX
Sujet
Énergie, Eau
Mot clé
Conservation de l'énergie/production de l'énergie Production d'énergie hydroélectrique Inspection Autorisation/permis Ouvrages Irrigation Inondation Institution
Aire géographique
Asie, Asie et Pacifique, East Asian Seas, Asie Orientale, Pacifique Nord, Pacifique Nord Occidental
Entry into force notes
These Measures entered into force as of the date of promulgation.
Résumé

The purpose of these Measures is to strengthen the management of hydropower project construction. The Measures consist of 35 Articles divided into 5 Chapters: General provisions (I); Acceptance of impoundment (II); Acceptance of engineering control (III); Final acceptance (IV); Supplementary provisions (V). The National Energy Administration is responsible for the management, guidance, coordination and supervision of the hydropower project acceptance. Acceptance of impoundment, acceptance of control engineering and final acceptance shall be carried out by an Acceptance Committee. The Acceptance Committee shall be set up by the host unit entrusted by the National Energy Administration in conjunction with relevant provincial authorities.