Measures for administration of safety appraisal of hydropower projects. Pays/Territoire Chine Type du document Règlement Date 2013 Source FAO, FAOLEX Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Production d'énergie hydroélectrique Inspection Aire géographique Asie, Asie et Pacifique, East Asian Seas, Asie Orientale, Pacifique Nord, Pacifique Nord Occidental Entry into force notes These Measurs entered into force as of thedate of promulgation. Résumé The purpose of these Measures is to strengthen the safety appraisal work management of hydropower projects, improve the project acceptance work quality, and ensure the safety of the projects. The Text consists of 41 Articles divided into 7 Chapters: General provisions (I); Organizing safety appraisal work (II); Responsibilities of construction units(III); water storage safety appraisal (IV); Project completion safety appraisal (V); Special safety appraisal (VI ); Supplementary provisions (VII). Texte intégral Chinois Site web www.dam.com.cn