Ecolex Logo
Le portail au
droit de l'environnement
Résultats de la recherche » Législation

List of fees of the Industrial Plant Basel concerning the use of the net for electrical energy.

Pays/Territoire
Suisse
Sous-division territoriale
Basel-Stadt
Type du document
Miscellaneous
Date
2011 (2015)
Source
FAO, FAOLEX
Sujet
Énergie
Mot clé
Conservation de l'énergie/production de l'énergie Production d'énergie hydroélectrique Royalties/redevances Protection du consommateur Mise en application
Aire géographique
Alpes, Europe, Europe et Asie Centrale, Atlantique du Nord-Est, Europe du Ouest
Résumé

The present List of fees is made under the Industrial Plants Basel Law of 11 February 2010. In particular, article 1 establishes that for a transparent allocation of the net costs the Swiss transmission and distribution net is divided into four voltages and three transformation levels and thus divided into seven net areas. The text consists of 35 articles divided into 6 Parts as follows: General provisions (I); Network usage charge network level 7 (low voltage level) (II); Network usage charge power level 5 (medium voltage) (III); Network usage charge level 3 (high voltage level) (3) (IV); Transitional and final provisions (VI).

Texte intégral
Allemand
Site web
www.bs.ch

Références - Législation

Implemente

Loi sur l’énergie (LEne).

Législation | Suisse | 1998 (2017)

Mot clé: Législation de base, Conservation de l'énergie/production de l'énergie, Production d'énergie hydroélectrique, Recherche, Subvention/incitation, Inspection, Cour/tribunaux, Mise en application, Infractions/sanctions

Source: FAO, FAOLEX

Industrial Plants Basel Law.

Législation | Suisse | 2009

Mot clé: Conservation de l'énergie/production de l'énergie, Institution, Responsabilité/indemnisation, Gaz naturel, Subvention/incitation, Procédures judiciaires/procédures administratives, Eau potable

Source: FAO, FAOLEX