Interim Measures for the Administration of Offshore Wind Power Development and Construction. Pays/Territoire Chine Type du document Règlement Date 2010 Source FAO, FAOLEX Sujet Énergie Mot clé Énergie renouvelable Politique/planification Conservation de l'énergie/production de l'énergie Aire géographique Asie, Asie et Pacifique, East Asian Seas, Asie Orientale, Pacifique Nord, Pacifique Nord Occidental Entry into force notes These Interim Measures entered into force on 22 January 2010. Résumé The purpose of the Measures is to regulate the development and construction management of offshore wind power projects. The Measures consist of 38 Articles. Texte intégral Chinois Site web www.nea.gov.cn Références - Législation Implemente Law of the People's Republic of China on the Administration of the Use of Sea Areas. Législation | Chine | 2001 Mot clé: Zone marine, Mer territoriale, Politique/planification, Institution, Autorisation/permis, Inspection, Infractions/sanctions Source: FAO, FAOLEX