General conditions for the supply of heat. Pays/Territoire Croatie Type du document Règlement Date 2006 Source FAO, FAOLEX Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Inspection Collecte de données/déclarations Procédures judiciaires/procédures administratives Aire géographique Europe, Europe et Asie Centrale, Pays de l'Union Européenne, Méditerranée, Europe du Sud Entry into force notes This Regulation enters into force on 1 January 2007. Résumé This Regulation provides all necessary standards and general conditions for the supply of thermal energy, including: the procedure for granting prior consent of thermal energy and creating conditions for connection to the distribution network; the issuance of the thermal energy approval; the conditions for joining, delivery and supply of heat and use of the heating system; monitoring over the security of supply and quality; mutual contractual agreements between distributors and users of thermal energy networks; the obligations and responsibilities of thermal energy and network users; the conditions of measurement, calculation and payment of delivered heat; the conditions for the use of restrictions or suspension over the delivery of thermal energy; procedures for determination and calculation of illegal consumption of thermal energy. Texte intégral Croate Site web www.nn.hr Références - Législation Implemente Energy Law (No. 01-081-01-2392/2). Législation | Croatie | 2001 Mot clé: Législation de base, Conservation de l'énergie/production de l'énergie, Production d'énergie hydroélectrique, Hydrocarbures, Gaz naturel, Énergie renouvelable, Autorisation/permis, Transport/dépôt Source: FAO, FAOLEX