Development Permit Regulations (P.E.I. Reg. EC773/08). Pays/Territoire Canada Sous-division territoriale Prince Edward Island Type du document Règlement Date 2008 Source FAO, FAOLEX Sujet Énergie Mot clé Conservation de l'énergie/production de l'énergie Énergie renouvelable EIA Autorisation/permis Mise en application Aire géographique Amériques, Arctique, Asie et Pacifique, Pacifique du Est, Amérique du Nord, Atlantique Nord Résumé The present Regulations are made under section 9(1) of the Renewable Energy Act. For the purpose of the present Regulations (d) “large capacity renewable energy generation facility” means a renewable energy generation facility that i) uses the wind to generate electric energy, and ii) has a name plate capacity equal to or greater than 1 megawatt. In particular, section 2 establishes in this context that no person shall construct a large capacity renewable energy generation facility, or cause one to be constructed, unless a development permit has first been issued by the Minister that authorizes the construction of such a facility. The text consists of 3 sections. Texte intégral Anglais Site web www.gov.pe.ca Références - Législation Implemente Renewable Energy Act (R.S.P.E.I. 1988, c. R-12.1). Législation | Canada | 1988 (2016) Mot clé: Législation de base, Conservation de l'énergie/production de l'énergie, Énergie renouvelable, Institution, Autorisation/permis, Politique/planification, Infractions/sanctions Source: FAO, FAOLEX Implementé par Renewable Energy Designated Areas Regulations (P.E.I. Reg. EC766/05). Législation | Canada | 2005 Mot clé: Conservation de l'énergie/production de l'énergie, Énergie renouvelable, Autorisation/permis, EIA, Mise en application, Zonage Source: FAO, FAOLEX