Ecolex Logo
Le portail au
droit de l'environnement
Résultats de la recherche » Législation

Development Permit Regulations (P.E.I. Reg. EC773/08).

Pays/Territoire
Canada
Sous-division territoriale
Prince Edward Island
Type du document
Règlement
Date
2008
Source
FAO, FAOLEX
Sujet
Énergie
Mot clé
Conservation de l'énergie/production de l'énergie Énergie renouvelable EIA Autorisation/permis Mise en application
Aire géographique
Amériques, Arctique, Asie et Pacifique, Pacifique du Est, Amérique du Nord, Atlantique Nord
Résumé

The present Regulations are made under section 9(1) of the Renewable Energy Act. For the purpose of the present Regulations (d) “large capacity renewable energy generation facility” means a renewable energy generation facility that i) uses the wind to generate electric energy, and ii) has a name plate capacity equal to or greater than 1 megawatt. In particular, section 2 establishes in this context that no person shall construct a large capacity renewable energy generation facility, or cause one to be constructed, unless a development permit has first been issued by the Minister that authorizes the construction of such a facility. The text consists of 3 sections.

Texte intégral
Anglais
Site web
www.gov.pe.ca

Références - Législation

Implemente

Renewable Energy Act (R.S.P.E.I. 1988, c. R-12.1).

Législation | Canada | 1988 (2016)

Mot clé: Législation de base, Conservation de l'énergie/production de l'énergie, Énergie renouvelable, Institution, Autorisation/permis, Politique/planification, Infractions/sanctions

Source: FAO, FAOLEX

Implementé par

Renewable Energy Designated Areas Regulations (P.E.I. Reg. EC766/05).

Législation | Canada | 2005

Mot clé: Conservation de l'énergie/production de l'énergie, Énergie renouvelable, Autorisation/permis, EIA, Mise en application, Zonage

Source: FAO, FAOLEX