Ecolex Logo
Le portail au
droit de l'environnement
Résultats de la recherche » Législation

Borehole Drilling and Excavation Works within the Saturated Zone Regulations (L.N. 254 of 2008).

Pays/Territoire
Malte
Type du document
Règlement
Date
2008
Source
FAO, FAOLEX
Sujet
Eau
Mot clé
Eaux souterraines Prélèvement d'eau Forage de puits/puits Autorisation/permis Infractions/sanctions
Aire géographique
Europe, Europe et Asie Centrale, Pays de l'Union Européenne, Méditerranée, Europe du Sud
Résumé

The scope of these Regulations is the establishment of a regulatory framework for borehole drilling and excavation works carried out partly or totally within the saturated zone. The latter is defined as the part of an aquifer in which all interconnected openings within the geological formation are completely filled with water. As a general rule, regulation 4 stipulates that the drilling of a borehole or any form of excavation works carried out partly or totally within the saturated zone is prohibited, unless a permit to this effect is issued by the Malta Resources Authority. Further provisions concern the application to obtain this permit.

Texte intégral
Anglais
Site web
www.doi.gov.mt

Références - Législation

Amendé par

Borehole Drilling and Excavation Works within the Saturated Zone (Amendment) Regulations, 2012 (L.N. 147 of 2012).

Législation | Malte | 2012

Mot clé: Prélèvement d'eau, Forage de puits/puits, Infractions/sanctions

Source: FAO, FAOLEX