An Act to amend 4 CMC § 8143 to require CUC to bill water, power, and sewer separately (P.L. 15-123). Pays/Territoire Îles Marriannes-Nord (EUA) Type du document Législation Date 2007 Source FAO, FAOLEX Sujet Énergie, Eau Mot clé Conservation de l'énergie/production de l'énergie Approvisionnement en eau Redevances pour les eaux Aire géographique Micronesie, Océanie, Pacifique Sud Résumé This Act amends Title 4 CMC section 8143 (Codification of the Commonwealth Public Utilities Commission Act of 2006) so as to require the Commonwealth Utilities Corporation to separate the electrical power, water consumption, and sewer services in its billing system so as to allow consumers to pay their utility bills separately, and to permit consumers to reconnect water or power services upon payment of their outstanding consumption charges and reconnection fees. Texte intégral Anglais Site web www.cnmileg.gov.mp Références - Législation Amende Commonwealth Public Utilities Commission Act of 2006 (P.L. 15-35). Législation | Îles Marriannes-Nord (EUA) | 2006 Mot clé: Conservation de l'énergie/production de l'énergie, Ouvrages, Approvisionnement en eau, Institution, Égouts, Eaux usées/déversement, Lutte contre la pollution, Pollution des eaux douces Source: FAO, FAOLEX