Regulation on the general conditions for electricity supply. País/Territorio Croacia Tipo de documento Reglamento Fecha 2006 Fuente FAO, FAOLEX Materia Energía Palabra clave Conservación de energía/producción de energía Comercio interior Acceso-a-la-información Procedimientos judiciales/procedimientos administrativos Autorización/permiso Área geográphica Europa, Europa y Central Asia, Países de la Unión Europea, Mediterráneo, Europa Meridional Entry into force notes This Regulation enters into force eight days after its publication in the Official Gazette and will be fully applied from 1 April 2006. Resumen This Regulation provides for General Conditions of Electricity Supply with its terms and conditions and is relevant to the: procedure for issuing of the provisional connection authorization and creating conditions for connecting to the grid; procedure for issuing of the energy consent (connection authorization); requirements for the connection, electricity supply and use of the network; quality of electricity supply; mutual contractual agreements between energy companies and users of the network; rights and responsibilities of the entities and network users; conditions of measurement, calculation and billing for the electricity supplied; conditions for the use of restriction or suspension of electricity supply; procedures for determination and calculation of illegal consumption of electricity. Texto completo Croata Página web www.nn.hr Referencias - Legislación Implementa Energy Law (No. 01-081-01-2392/2). Legislación | Croacia | 2001 Palabra clave: Legislación básica, Conservación de energía/producción de energía, Producción de energía hidroeléctrica, Hidrocarburos, Gas natural, Energía renovable, Autorización/permiso, Transporte/depósito Fuente: FAO, FAOLEX