Ecolex Logo
El portal del
derecho ambiental
Resultados de la búsqueda » Legislación

Prime Minister’s Decision No. 722 of 2022 issuing the Executive Regulations for the Law regulating Waste Management promulgated by Law No. 202 of 2020.

País/Territorio
Egipto
Tipo de documento
Reglamento
Fecha
2022
Fuente
FAO, FAOLEX
Materia
Medio ambiente gen., Desechos y sustancias peligrosas
Palabra clave
Gestión de desechos Efluente de aguas residuales/vertido Residuos peligrosos Reciclado/reutilización Eliminación de desechos Residuos no domésticos Autorización/permiso Negocios/industria/corporaciones Fortalecimiento de la capacidad Educación Institución Manejo integrado Monitoreo Cuestiones de procedimiento Protección del medio ambiente Participación público privada (PPP) Residuos sólidos Normas Uso sostenible Transporte/depósito Residuos domésticos Prevención de residuos
Área geográphica
Africa, Mediterráneo, Medio Oriente, Africa del Norte y Cercano Oriente, Africa del Norte, Mar Rojo & Golfo de Adén
Entry into force notes
These Regulations enter into force the day after their publication in the Official Gazette.
Resumen

These Regulations, comprising 56 articles divided into six Chapters, address a range of topics including general provisions, the national integrated waste management strategy, the duties and responsibilities of involved entities, the prerequisites for conducting integrated waste management operations, and the classification of waste types such as non-hazardous, municipal, construction, agricultural, industrial, and hazardous waste. Additionally, they incorporate provisional measures and provide template forms for license applications, waste registers, and guidelines within the 15 attached Schedules. Chapter three outlines a key policy mandating that waste generators or owners must ensure the secure disposal of waste from their facilities, projects, or operations upon the delivery, initiation, or conclusion of any new, refurbished, or existing projects. This disposal should be completed within a maximum period of twenty days following the project's delivery, start, or the end of the activities that produced the waste, particularly when the waste is located beyond the premises of the specified facilities or projects. Furthermore, these individuals or entities are obligated to comply with the guidelines and stipulations detailed in the appendices accompanying these regulations. The Regulations provide for a grace period of one year for relevant entities to comply with their provisions.

Texto completo
Árabe
Página web
www.eeaa.gov.eg

Referencias - Legislación

Implementa

Waste Management Law No.202 of 2020.

Legislación | Egipto | 2020

Palabra clave: Protección del medio ambiente, Residuos peligrosos, Eliminación de desechos, Gestión de desechos, Prevención de residuos, Legislación básica, Manejo integrado, Residuos no domésticos, Residuos sólidos, Reciclado/reutilización, Fondo especial, Transporte/depósito, Eco-productos/ecoprocesos, Sustancias peligrosas, Salud pública, Institución, Entidad no gubernamental, Subvención/incentivo, Autorización/permiso, Contaminación de las aguas dulces, Control de la contaminación

Fuente: FAO, FAOLEX