Presidential Decree No. 153 “On development of the electric power industry.” País/Territorio Belarús Tipo de documento Reglamento Fecha 2021 Fuente FAO, FAOLEX Materia Energía Palabra clave Conservación de energía/producción de energía Energía nuclear Producción de energía hidroeléctrica Contrato/acuerdo Área geográphica CEI (Comunidad de Estados Independientes), Europa Oriental, Europa, Europa y Central Asia Entry into force notes This Presidential Decree enters into force six months after the date of its official publication. Resumen The President, with a view of improving energy supply, establishes that block stations connected directly or indirectly to electric networks of power supply organizations, electric stations of power supply organizations and the Belarusian nuclear power plant are subject to a unified operational and dispatching control in the electric power industry on the basis of contracts for the provision of services for operational dispatch management in the electric power industry. These contracts are concluded in the manner specified by the Rules for access to services for operational dispatch control in the electric power industry, approved by the Council of Ministers of the Republic of Belarus. Energy supply organizations and State Production Association "Belenergo" provide services for: (a) distribution of electrical energy produced by block stations on electric networks of power supply organizations within one area on the basis of a contract for the provision of distribution services related to electrical energy concluded between the owner of the block-station and the power supply organization to the electrical network of which block station directly connected; and (b) transmission and distribution of electrical energy produced by block stations on electric networks of power supply organizations within several regions on the basis of a service agreement for the transmission and distribution of electrical energy, concluded between the owner of a block-station with an installed electric capacity of 25 MW and more, by the power supply organization, to the electrical network of which a block station is directly connected, and the State Production Association "Belenergo". Texto completo Ruso Página web president.gov.by