Order No. 125 on surcharges applied to electricity produced by photovoltaic plants connected to the grid on 20 November 2012 or later. País/Territorio Dinamarca Tipo de documento Reglamento Fecha 2015 Fuente FAO, FAOLEX Materia Energía, Mar Palabra clave Conservación de energía/producción de energía Comercio interior Energía renovable Derechos/cánones Área geográphica Europa, Europa y Central Asia, Países de la Unión Europea, Mar del Norte, Atlántico Nordeste, Europa Septentrional Entry into force notes 11 February 2015. Resumen The purpose of this Order is to establish surcharges to apply on the production of electricity by photovoltaic plants connected from 20 November 2012 and thereafter. Surcharges may be augmented in accordance to Energinet.dk, specifically for pool of photovoltaic plants of 20MW/year production between 2013-2016. Agreement for the increase of surcharges is based on the installation address specified in the application, and may not delegated. Texto completo Danés Página web www.retsinformation.dk Referencias - Legislación Implementa Act on Promotion of Renewable Energy (No. 122 of 2015). Legislación | Dinamarca | 2013 (2015) Palabra clave: Eco-productos/ecoprocesos, Conservación de energía/producción de energía, Normas sobre calidad ambiental, Producción de energía hidroeléctrica, Comercio interior, Energía renovable, Subvención/incentivo, Cambio climático, Legislación básica, Normas, Protección del medio ambiente, Protección del hábitat, Uso sostenible Fuente: FAO, FAOLEX