Energy Undertakings: Exempt Undertakings (O. Reg. 305/10). País/Territorio Canadá Subdivisión territorial Saskatchewan Tipo de documento Reglamento Fecha 2010 Fuente FAO, FAOLEX Materia Energía Palabra clave Conservación de energía/producción de energía Negocios/industria/corporaciones Gas natural Autorización/permiso Área geográphica Americas, Ártico, Asia y Pacifico, Pacífico Oriental, América del Norte, Atlántico Norte Resumen The present Regulation is made under the Planning Act. In particular, the Regulation establishes that the York Energy Centre is not subject to certain sections of the afore-mentioned Act. For the purpose of the present Regulation the “York Energy Centre Project” means the undertaking that is the natural gas-fired simple cycle peaking electrical generation facility proposed to be located on those lands legally described as being in the Township of King, York Region. The text consists of 2 sections. Texto completo Inglés Página web www.gov.on.ca Referencias - Legislación Implementa Planning Act (R.S.O. 1990, c. P.13). Legislación | Canadá | 1990 (2016) Palabra clave: Manejo de tierras, Comisión de tierras, Tenencia de tierras, Concentración parcelaria, Reforma agraria, Valoración de tierras, Subdivisión de tierras, Inspección, Legislación básica Fuente: FAO, FAOLEX