Water Power Regulation (Man. Reg. 25/88). Country/Territory Canada Territorial subdivision Manitoba Document type Regulation Date 1988 (2010) Source FAO, FAOLEX Subject Water Keyword Waterworks Hydropower generation Freshwater resources management Water rights Authorization/permit Transport/storage Enforcement/compliance Indigenous peoples Geographical area Americas, Arctic, Asia and the Pacific, East Pacific, North America, North Atlantic Abstract The present Regulation contains at the outset a definition clause relating to various terms employed therein, such as “actual construction”, “actual cost”, “applicant”, “court”, “final construction plans”, “final licence”, “general construction plans”, “survey permit”, “work”, “power development”, etc. Section 3 establishes that every applicant for a licence to divert, use or store water for power purposes shall file with the director a statement giving or accompanied by the information listed in this section. The text consists of 90 sections. Full text English/French Website www.gov.mb.ca References - Legislation Implements Water Power Act (C.C.S.M. c. W60). Legislation | Canada | 1987 (2013) Keyword: Hydropower generation, Institution, Freshwater resources management, Water rights, Expropriation, Integrated management Source: FAO, FAOLEX