Resolution No. 56 of 2015 of Georgian Government on State Program of “Plant the Future” Country/Territory Georgia Document type Regulation Date 2015 (2021) Source FAO, FAOLEX Original source 340170000.10.003.018441 Subject Cultivated plants, Water, General Keyword Financing Plant production Planting material/seeds Subsidy/incentive Monitoring Hazards Irrigation Geographical area Asia, Black Sea, Eastern Europe, Europe, Europe and Central Asia, Western Asia Abstract This Resolution approves the State Program of “Plant the Future”. It consists of the following articles: Purpose and objectives of the program (1); Program components (2); Multi-year gardens financing component (3); Financial assistance (4); Restrictions (5); Technical assistance (6); Beneficiary of the garden component (7); Beneficiary conformity criteria (8); Conditions to receiving the finances (9); Other terms (10); Documents a beneficiary needs to present to receive finances (11); Procedure for issuing co-financing (12); Monitoring (13); Co-financing component for planting material operations (15); Project that needs to be presented for the component for planting material operations and the amount of co-financing (16); Limits and intended uses of the co-financing component for planting material operations (17); Technical assistance (18); Beneficiary of the co-financing component for planting material operations (19); Conformity criteria (20); Documents a beneficiary needs to present to receive finances (21); Procedure for issuing co-financing (22); Monitoring (23); Additional obligations of a beneficiary and non-compliance with the intended use by a beneficiary (24); Co-financing component for organizing anti-hailing systems and/or irrigation system based on wells/boreholes/drip irrigation (24-1); Financial assistance (24-2); Beneficiary of the co-financing component for organizing anti-hailing systems and/or irrigation system based on wells/boreholes/drip irrigation (24-3); Conformity criteria for a potential beneficiary (24-4); Documents that need to be presented by a potential beneficiary (24-5); Procedure for issuing co-financing (24-6); Financing of planting materials damaged by disasters (24-7); Financial assistance (24-8); Beneficiary of the of the co-financing component for planting material operations (24-9); Conformity criteria for a potential beneficiary (24-10); Documents that need to be presented by a potential beneficiary (24-11); Procedure for issuing finances (24-12); Monitoring (24-13); Implementation of the program (25); and Conflict of interest (26). The Resolution also contains Annex No. 1 – List of perennial cultures by regions; Annex No. 2 – Table of the maximum amounts of co-financing per culture; Annex No. 4 – Minimum number of planting materials per 1 ha per perennial cultures; Annex No. 9 – Price for installing an anti-hail systems per 1 ha; Annex No. 10 – Table of maximum financing per culture within the co-financing component for planting material operations. Full text Georgian Website matsne.gov.ge