Regulation on the general conditions for electricity supply. Country/Territory Croatia Document type Regulation Date 2006 Source FAO, FAOLEX Subject Energy Keyword Energy conservation/energy production Internal trade Access-to-information Legal proceedings/administrative proceedings Authorization/permit Geographical area Europe, Europe and Central Asia, European Union Countries, Mediterranean, Southern Europe Entry into force notes This Regulation enters into force eight days after its publication in the Official Gazette and will be fully applied from 1 April 2006. Abstract This Regulation provides for General Conditions of Electricity Supply with its terms and conditions and is relevant to the: procedure for issuing of the provisional connection authorization and creating conditions for connecting to the grid; procedure for issuing of the energy consent (connection authorization); requirements for the connection, electricity supply and use of the network; quality of electricity supply; mutual contractual agreements between energy companies and users of the network; rights and responsibilities of the entities and network users; conditions of measurement, calculation and billing for the electricity supplied; conditions for the use of restriction or suspension of electricity supply; procedures for determination and calculation of illegal consumption of electricity. Full text Croatian Website www.nn.hr References - Legislation Implements Energy Law (No. 01-081-01-2392/2). Legislation | Croatia | 2001 Keyword: Basic legislation, Energy conservation/energy production, Hydropower generation, Oil, Natural gas, Renewable energy, Authorization/permit, Transport/storage Source: FAO, FAOLEX