Ecolex Logo
The gateway to
environmental law
Search results » Legislation

Regulation on the general conditions for electricity supply.

Country/Territory
Croatia
Document type
Regulation
Date
2006
Source
FAO, FAOLEX
Subject
Energy
Keyword
Energy conservation/energy production Internal trade Access-to-information Legal proceedings/administrative proceedings Authorization/permit
Geographical area
Europe, Europe and Central Asia, European Union Countries, Mediterranean, Southern Europe
Entry into force notes
This Regulation enters into force eight days after its publication in the Official Gazette and will be fully applied from 1 April 2006.
Abstract

This Regulation provides for General Conditions of Electricity Supply with its terms and conditions and is relevant to the: procedure for issuing of the provisional connection authorization and creating conditions for connecting to the grid; procedure for issuing of the energy consent (connection authorization); requirements for the connection, electricity supply and use of the network; quality of electricity supply; mutual contractual agreements between energy companies and users of the network; rights and responsibilities of the entities and network users; conditions of measurement, calculation and billing for the electricity supplied; conditions for the use of restriction or suspension of electricity supply; procedures for determination and calculation of illegal consumption of electricity.

Full text
Croatian
Website
www.nn.hr

References - Legislation

Implements

Energy Law (No. 01-081-01-2392/2).

Legislation | Croatia | 2001

Keyword: Basic legislation, Energy conservation/energy production, Hydropower generation, Oil, Natural gas, Renewable energy, Authorization/permit, Transport/storage

Source: FAO, FAOLEX