Regulation on conditions and procedure of acquiring the status of privileged power producers. Country/Territory Serbia Document type Regulation Date 2013 Source FAO, FAOLEX Subject Energy Keyword Energy conservation/energy production Renewable energy Legal proceedings/administrative proceedings Geographical area Europe, Europe and Central Asia Entry into force notes This Regulation enters into force eight days after its publication in the Official Gazette. Abstract This Regulation prescribes all necessary terms, conditions and procedures for acquiring the status of privileged power producer on the territory of the Republic of Serbia, including the content and evidence status of compliance with the conditions needed, the minimum level of primary energy used in power plants, depending on the type of primary fuel and installed capacity, maximum total installed capacity of wind farms and solar power plants that can acquire the privileged or temporary privileged status, as well as a way of keeping the register of privileged producers. Full text Serbian Website www.mre.gov.rs