Measures for the administration of acceptance of hydropower engineering projects. Country/Territory China Document type Regulation Date 2011 Source FAO, FAOLEX Subject Energy, Water Keyword Energy conservation/energy production Hydropower generation Inspection Authorization/permit Waterworks Irrigation Flood Institution Geographical area Asia, Asia and the Pacific, East Asian Seas, Eastern Asia, North Pacific, North-West Pacific Entry into force notes These Measures entered into force as of the date of promulgation. Abstract The purpose of these Measures is to strengthen the management of hydropower project construction. The Measures consist of 35 Articles divided into 5 Chapters: General provisions (I); Acceptance of impoundment (II); Acceptance of engineering control (III); Final acceptance (IV); Supplementary provisions (V). The National Energy Administration is responsible for the management, guidance, coordination and supervision of the hydropower project acceptance. Acceptance of impoundment, acceptance of control engineering and final acceptance shall be carried out by an Acceptance Committee. The Acceptance Committee shall be set up by the host unit entrusted by the National Energy Administration in conjunction with relevant provincial authorities. Full text Chinese Website www.gov.cn