Ecolex Logo
The gateway to
environmental law
Search results » Legislation

Measures for the administration of acceptance of hydropower engineering projects.

Country/Territory
China
Document type
Regulation
Date
2011
Source
FAO, FAOLEX
Subject
Energy, Water
Keyword
Energy conservation/energy production Hydropower generation Inspection Authorization/permit Waterworks Irrigation Flood Institution
Geographical area
Asia, Asia and the Pacific, East Asian Seas, Eastern Asia, North Pacific, North-West Pacific
Entry into force notes
These Measures entered into force as of the date of promulgation.
Abstract

The purpose of these Measures is to strengthen the management of hydropower project construction. The Measures consist of 35 Articles divided into 5 Chapters: General provisions (I); Acceptance of impoundment (II); Acceptance of engineering control (III); Final acceptance (IV); Supplementary provisions (V). The National Energy Administration is responsible for the management, guidance, coordination and supervision of the hydropower project acceptance. Acceptance of impoundment, acceptance of control engineering and final acceptance shall be carried out by an Acceptance Committee. The Acceptance Committee shall be set up by the host unit entrusted by the National Energy Administration in conjunction with relevant provincial authorities.

Full text
Chinese
Website
www.gov.cn