Ecolex Logo
The gateway to
environmental law
Search results » Legislation

Interim Measures for Management of Credit Evaluation of Main Body of Water Conservancy Construction Market.

Country/Territory
China
Document type
Regulation
Date
2015 (2019)
Source
FAO, FAOLEX
Subject
Water
Keyword
Waterworks Inspection
Geographical area
Asia, Asia and the Pacific, East Asian Seas, Eastern Asia, North Pacific, North-West Pacific
Abstract

These Interim Measures aim to standardize the credit evaluation of the main bodies of the water conservancy construction market, promote the construction of the credit system thereof, and guarantee the quality and safety of the water conservancy construction. The Interim Measures consist of 24 Articles divided into 5 Chapters: General Provisions; Evaluation criteria; Evaluation procedures; Dynamic management; Supervision and administration.

Full text
Chinese
Website
www.waizi.org.cn