An Act to amend 4 CMC § 8143 to require CUC to bill water, power, and sewer separately (P.L. 15-123). Country/Territory Northern Mariana Is. (USA) Document type Legislation Date 2007 Source FAO, FAOLEX Subject Energy, Water Keyword Energy conservation/energy production Water supply Water charges Geographical area Micronesia, Oceania, South Pacific Abstract This Act amends Title 4 CMC section 8143 (Codification of the Commonwealth Public Utilities Commission Act of 2006) so as to require the Commonwealth Utilities Corporation to separate the electrical power, water consumption, and sewer services in its billing system so as to allow consumers to pay their utility bills separately, and to permit consumers to reconnect water or power services upon payment of their outstanding consumption charges and reconnection fees. Full text English Website www.cnmileg.gov.mp References - Legislation Amends Commonwealth Public Utilities Commission Act of 2006 (P.L. 15-35). Legislation | Northern Mariana Is. (USA) | 2006 Keyword: Energy conservation/energy production, Waterworks, Water supply, Institution, Sewerage, Effluent waste water/discharge, Pollution control, Freshwater pollution Source: FAO, FAOLEX